Picture of Oxide Furnace
Current status:
AVAILABLE
Book | Log
Show/Collapse all

1st Responsible:
2nd Responsible:
You must be logged in to view files.

The oxide furnace is the top tube. The lower one is for doping with phosphor.

Typical oxidasation process is 1000C for six hours. Count 1 hour for reaching the temperature.

Make sure the waterboiler is filled at all times.

Tool name:
Oxide Furnace
Area/room:
E:1332 Renrum
Category:
ELMÄT
Manufacturer:
..
Model:
..

Instructors

Licensed Users

You must be logged in to view tool modes.